Technical article: The ” quick pig ” establishes

Pigging a pipeline must become easier and safer! Without a complex manhole, without time-consuming ventilation of the manhole, directly from the street, made of PE 100 and corrosion-free. With these requirements, Hamburg’s municipal drainage system (now Hamburg Wasser) approached Reinert-Ritz GmbH from Nordhorn. The fittings manufacturer developed a station that enables fast, safe pigging without a manhole and has been used successfully in various projects to date.

3 min.
Erfolgreich mit der Molchschleuse Quick-Pig gefangener Molch

Maintenance and cleaning of sewage pressure pipes

Especially when working in manholes, accidents at work occur time and again, be it due to slipping from ladders or bumping into each other in the confined working space. A great danger when working in manholes is also the presence of sewer gases and/or gases escaping from the ground. NOnce these gases have been detected, the manhole must be ventilated using appropriate means and measures, and the resulting waiting time delays the start of the planned work. In addition, since the space required to accommodate and operate fittings in manholes must be taken into account for new construction as well as retrofitting, this can be associated with high costs.

Minimal inversion installation of a Quick-Pig pigging station at Hamburg Wasser in an existing structure with a small excavation pit
Hamburg water:
Minimal inversion installation of the Quick-Pig pig station in existing wastewater pressure pipeline with small excavation pit

Therefore, Reinert-Ritz GmbH set to work, implemented the requirements specified by Hamburg’s municipal drainage system in a way that was suitable for plastic and tested them in the company’s own test centre. The result was a compact pigging station as an alternative to large, expensive concrete manholes, which can be installed under standard road covers next to existing pipes and cables. It eliminates the need to test for gas and pump out water, which can occur in manholes. The operation of the airlock is simple and fast thanks to the bayonet lock. According to the manufacturer, in addition to the construction costs, the life cycle costs due to maintenance operation are also significantly lower than the costs of the standard manhole solution. In addition, the pigging station facilitates the recording of the condition of the pressure pipe required by the various self-inspection ordinances of the federal states.

The first pigging station was installed in August 2014 in the Hamburg district of Lurup in an existing PE100 wastewater pressure pipe of dimension d 160 mm with little construction effort. After the successful successfully commissioned, pigging can now be carried out quickly and safely. And because the term “Molch” is “pig” in English, the name of the fast pigging station was also found: Quick-Pig.

YouTube

Mit dem Laden des Videos akzeptieren Sie die Datenschutzerklärung von YouTube.
Mehr erfahren

Video laden

The Zweckverband Lollar-Staufenberg (ZLS), which is active as a service provider in the areas of water supply, wastewater discharge and wastewater treatment, also used the Quick-Pig system for the first time in Hesse as part of a pilot project. The ZLS operates a total of seven sewage pressure pipes with a total length of about 5 km in its association area. They represent about 4% of the total network length of the ZLS. In the past, the operation and maintenance of the pressure pipeline systems, some of which are over 20 years old, focused primarily on the maintenance of the mechanical and electrical equipment of the pumping stations and pumping stations. In 2016, the rehabilitation of three older pumping stations was planned. For the cleaning of the pipelines, pig accesses were planned. The retrofitting of a pigging station was also planned for an existing sewage pressure line.

Since the cleaning and inspection of sewage pressure pipes was not possible with the usual method of gravity sewers, but at the same time the operational risk in the event of damage was much greater, the Quick-Pig system from Reinert Ritz GmbH was used.
In the meantime, more than 60 Quick-Pig pigging stations have been installed in Germany for pipe dimensions from d 63 mm to d 180 mm.
have been installed. Four Quick-Pig pigging stations of the dimension d 315 mm were even delivered to Scandinavia.

Erfolgreich mit der Molchschleuse Quick-Pig gefangener Molch
ZLS Lollar:
Pig successfully caught with the pig trap Quick-Pig

Product presentations and professional advice for your planning are available from our Sales team to Quick-Pig – contact directly!

Sales team to Quick-Pig – contact directly!

About the author

UP TO DATE

Subscripe to our newsletter.

Please enter a valid email address.

More topics

Related articles

Pressure pipe cleaning and inspection with the Quick-Pig pigging station - Gemeinde Glattfelden

In Glattfelden, a problem with deposits in the pipes has arisen. Patrick Frei, the municipality’s wastewater treatment supervisor in charge, decided to clean the pressure pipe and relies on the gentle pigging process. The biggest problem with pigging is that the pig has to be inserted into the pipeline, which means that the existing pipeline has to be dismantled and opened. This is a laborious process, which Frei was able to improve significantly with the Quick-Pig pig trap.

Zeichnung der Meeresquerung mittels PE 100 Rohr und Ansicht der Verankerungsstellen auf dem Meerboden  zwischen der TĂĽrkei und Zypern

Reinert-Ritz GmbH develops innovative products made of thermoplastic material. The result of the experience gained in this way are moulded parts that are not available on the market as standard in these sizes. In addition to their size, these products convince more and more new customers worldwide with their quality and safety. With its many years of experience, seamless quality assurance and high production quality, Reinert-Ritz was also able to convince the planners of this major project.

The new pigging station enables LINEG’s managers to inspect and clean the installed pipeline from the top of the terrain with a pig. All this is made possible by one of the most modern pigging stations, which allows those responsible for sustainable water management to protect both the environment and the budget at the same time.